Dover Select Board Endorses 25 Warrant Articles, Awards Two Grant-Funded Culvert Contracts
DOVER — April 14, 2026 — Dover Select Board unanimously endorses 25 town meeting warrant articles and awards a fully grant-funded culvert contract. The board, consisting of Chair Robin Hunter, Vice Chair Dave Haviland, and member Cam Hudson, voted April 14 to back all Warrant Committee recommendations except Article 19, a site plan review zoning bylaw held pending final Planning Board language, while reserving floor time at the May 4 annual town meeting to flag concerns about the Carroll Park article, which bundles a needed $500,000 drainage and parking fix with permanent pickleball courts whose separate cost neither the DPW nor the project proponents would break out. The board awarded a construction contract to Aqualine Utility Inc. of Weymouth at $391,275 — the low bid among seven — for the Dedham Street culvert replacement, fully covered by a state community one-stop grant and federal earmark, and approved a companion engineering contract with Woodard and Curran at no additional town cost. Engineering firm TEC presented updated intersection renderings for a MassDOT bottleneck grant worth up to $1 million but drew pushback on signal head counts and inadequate left-turn capacity on Walpole Street, with no vote taken and a public information session planned for after town meeting. The board also approved a Glen Street road treatment contract with All States Construction at $182,072.50, a library HVAC design agreement with Lyro Hill Corp., and the appointment of Erin Roden-Savla to the Board of Registrars through June 2029, before entering executive session on labor negotiations and community center litigation.
Keep reading with a 14-day free trial
Subscribe to The Dover MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news